Main Page | Contact | Türkçe
 
» Qatar Gabbro Berth Expansion Projects at Mesaieed Port Berth-3
» Reinforcement of Breakwater Mustapha (Algeria)
» Wreck Removal of Ro-Ro Vessel Hayat N
» Salvage of Karaköy Passenger Terminal Barge
» Wreck Removal of Sunken Cargo Vessel M/V Dimitrios P
» Towage of Accommodation Barge Ersai 400
» Salvage of Tugboat M/T Aktak
» Reconstruction & Reinforcement of Breakwater Kheireddine (Algeria)
» Towage of 500 m in Length One Piece Pipes of Enka Construction to Libya
» Salvage of Cargo Vessel M/V Herex 4
» Salvage of Cargo Vessel M/V Olivia
» Cargo Transfer from M/V Kocatepe S
» Installation of Western Black Sea Natural Gas & Oil Exploration & Production Platforms of TPAO
» Wreck Removal of Tugboat M/V Tajfun
» Salvage of Yacht Desire-4
» Salvage of General Cargo Vessel M/V Mina-I
» Geotechnical Site Investigations of Akçakoca Natural Gas Exploration & Production Projects of TPAO
» Wreck Removal of General Cargo Ship M/V Mare
» Jetty Reinforcement in Port of Arzew (Algeria)
» Abutaraba Desalination Plant Seawater Intake Line Construction (Libya)
» Refloatation of Seismic Survey Vessel M/V Pejwak (Azerbaijan)
» Limbo and Reverse-Limbo of Cargo of M/V Ariadne
» Arzew Desalination Plant & Power Station Brine Outfall Construction (Algeria)
» Removal of Fuel Oil & Lubricating Oil from Cargo Vessel M/V Corona Z
» Cleaning of Oil Pollution Caused by Cargo Vessel M/V MSC Roberta
» Bou-Haroun Port Dredging Works (Algeria)
» Recovery of Fuel Oil & Lubricating Oil from M/T Yakıt-1 Tanker
» Salvage of Cargo Vessel M/V Lujin-1
» Salvage of Seabus Delphine XXII
» Refloatation of Büyük Çamlıca
» Salvage of Cargo Vessel M/V Mustafa Sofuoğlu
» Salvage of Bulk Carrier M/V Pos Ambition
» Cleaning of Oil Pollution Caused by Antarctica & Sfakia Tankers
» Salvage of Cargo Barge F/B Rosetti Uno
» Wreck Removal of General Dry Cargo Ship M/V Robel
» Ege Gas LNG Terminal Sea Water Intake & Discharge Pipelines Construction
» Salvage of Cargo Vessel M/V Nazım Bayraktar
» Transfer of Fuel Oil from M/V Pelmariner & Cleaning of Environmental Pollution
» Prevention & Cleaning of Environmental Pollution Resulted from M/V Martin P
» Refloatation of M/T Marmara Tanker
» Environmental Cleaning of Serious Oil Pollution Caused by TPAO Tanker
» Salvage of M/T Metin KA from Enourmous Explosion on TPAO Tanker
  Reinforcement of Breakwater Mustapha (Algeria)


 

Name of Project

Reinforcement of Breakwater Mustapha

Place of Project

Port of Alger – Alger / ALGERIA

Working Dates

January 2008 – May 2010

Organizations Involved

§      Algerian Democratic and Popular Republic, Ministry of Public Works, Directorate of Public Works of Province of Alger (Project Owner)

§      GMSA Group of Meditram, Sotramest, Aras (Group of companies including ARAS was established in order to work together for this project)

Scope of Works

§     .Main jetty is being strengthened. In this regard, existing protection wall, inner and outer slopes, and walking way will be reconstructed; cavities formed due to water corrosion will be filled with concrete.

§     .Sunken vessels and other materials around the jetty are being cut into smaller pieces and taken out. They will be submerged into an appointed area in the offshore.

§     .Quarry was dug. Stones quarried in weights of 0-0.5 ton, 1-3 tons, and 3-6 tons are being laid by using online DGPS and echosounder in order to strengthen the jetty.

§     .Blocks in weights of 50-65 tons are being laid by using online DGPS and echosounder in order to strengthen the jetty.

§     .A concrete station will be founded and the existing protection wall in height of 9 m, length of 704 m, and width of 2 m will be reinforced. Current walking way damaged due to marine movements will be restored by pouring concrete in height of average of 50 cm.

§     .Cavities formed between the main blocks of the jetty and seabed due to marine movements will be filled with concrete by the aid of formworks prepared by professional divers via pumping concrete from the jetty.

Two self-propelled split barges (Paşa ve Midia-13), self-propelled floating crane Herkül, floating crane Haşmetli, barge LM 11, tugboat Vega 3, and tugboat Dalgıç equipped with online DGPS and echosounder were used in the operations.

 

  Data1 Yazılım & Web Tasarım