» Qatar Gabbro Berth Expansion Projects at Mesaieed Port Berth-3
» Reinforcement of Breakwater Mustapha (Algeria)
» Wreck Removal of Ro-Ro Vessel Hayat N
» Salvage of Karaköy Passenger Terminal Barge
» Wreck Removal of Sunken Cargo Vessel M/V Dimitrios P
» Towage of Accommodation Barge Ersai 400
» Salvage of Tugboat M/T Aktak
» Reconstruction & Reinforcement of Breakwater Kheireddine (Algeria)
» Towage of 500 m in Length One Piece Pipes of Enka Construction to Libya
» Salvage of Cargo Vessel M/V Herex 4
» Salvage of Cargo Vessel M/V Olivia
» Cargo Transfer from M/V Kocatepe S
» Installation of Western Black Sea Natural Gas & Oil Exploration & Production Platforms of TPAO
» Wreck Removal of Tugboat M/V Tajfun
» Salvage of Yacht Desire-4
» Salvage of General Cargo Vessel M/V Mina-I
» Geotechnical Site Investigations of Akçakoca Natural Gas Exploration & Production Projects of TPAO
» Wreck Removal of General Cargo Ship M/V Mare
» Jetty Reinforcement in Port of Arzew (Algeria)
» Abutaraba Desalination Plant Seawater Intake Line Construction (Libya)
» Refloatation of Seismic Survey Vessel M/V Pejwak (Azerbaijan)
» Limbo and Reverse-Limbo of Cargo of M/V Ariadne
» Arzew Desalination Plant & Power Station Brine Outfall Construction (Algeria)
» Removal of Fuel Oil & Lubricating Oil from Cargo Vessel M/V Corona Z
» Cleaning of Oil Pollution Caused by Cargo Vessel M/V MSC Roberta
» Bou-Haroun Port Dredging Works (Algeria)
» Recovery of Fuel Oil & Lubricating Oil from M/T Yakıt-1 Tanker
» Salvage of Cargo Vessel M/V Lujin-1
» Salvage of Seabus Delphine XXII
» Refloatation of Büyük Çamlıca
» Salvage of Cargo Vessel M/V Mustafa Sofuoğlu
» Salvage of Bulk Carrier M/V Pos Ambition
» Cleaning of Oil Pollution Caused by Antarctica & Sfakia Tankers
» Salvage of Cargo Barge F/B Rosetti Uno
» Wreck Removal of General Dry Cargo Ship M/V Robel
» Ege Gas LNG Terminal Sea Water Intake & Discharge Pipelines Construction
» Salvage of Cargo Vessel M/V Nazım Bayraktar
» Transfer of Fuel Oil from M/V Pelmariner & Cleaning of Environmental Pollution
» Prevention & Cleaning of Environmental Pollution Resulted from M/V Martin P
» Refloatation of M/T Marmara Tanker
» Environmental Cleaning of Serious Oil Pollution Caused by TPAO Tanker
» Salvage of M/T Metin KA from Enourmous Explosion on TPAO Tanker
  Wreck Removal of Ro-Ro Vessel Hayat N


Name of Vessel
M/V Hayat N
Date of Incident
September 14, 2008
Place of Incident
Bandırma – Balıkesir / TÜRKİYE
Incident
Turkish flagged, 116.27 m in length, 8547 GRT Ro-Ro cargo ship Hayat N carrying 73 trucks and 2 cars on board sank at a depth of 20 m and 300 m off shore after departing Bandırma Port.
Working Dates
December 2008 – February 2010
Organizations Involved
§ T.R. Governorship of Kocaeli, Commission of Vessel Accident Investigation and Assessment
§ British Marine P&I Club
§ Omur Marine Ltd. (Correspondent of P&I Club)
§ Cavus & Coskunsu Law Firm (Representative of the Shipowner)
§ T.R. Governorship of Kocaeli, Directorate of Environment and Forestry
§ T.R. Prime Ministry Undersecretariat for Maritime Affairs, Directorate of ÇanakkaleRegion,Bandırma Harbour Master’s Office
§ AE Shipyard
Scope of Works
The wreck removal operation of the vessel, which includes removal and disposal of the pieces belonging to the ship and spread over the seabed, dead bodies, cargo, any loose debris, residual fuel, lubricants, and whatever remained on the vessel, was given to Aras & Solar Joint Venture with an agreement by P&I Club. The operations achieved so far under the supervision of a surveyor assigned by the P&I Club are as follows:
§ Because fuel oil and lubricants on board were removed before, the residuals were removed by our team.
§ 73 trucks and 2 cars were being discharged from Hayat N and sold to scrap firms.
§ Accommodation section and portside hull of the accommodation section of the vessel were cut underwater and removed by the help Floating Sheerleg Seka Ak-1 with 500 tons lifting capacity.
§ After welding and patching the openings and cracked sections of the vessel for water tightness, the capsized vessel was refloated and towed to a shipyard in Bandırma by Floating Sheerleg Seka Ak-1 and Tugboat Pegasus-3 for uprighting operation.

 

 