Main Page | Contact | Türkçe
 
» Qatar Gabbro Berth Expansion Projects at Mesaieed Port Berth-3
» Reinforcement of Breakwater Mustapha (Algeria)
» Wreck Removal of Ro-Ro Vessel Hayat N
» Salvage of Karaköy Passenger Terminal Barge
» Wreck Removal of Sunken Cargo Vessel M/V Dimitrios P
» Towage of Accommodation Barge Ersai 400
» Salvage of Tugboat M/T Aktak
» Reconstruction & Reinforcement of Breakwater Kheireddine (Algeria)
» Towage of 500 m in Length One Piece Pipes of Enka Construction to Libya
» Salvage of Cargo Vessel M/V Herex 4
» Salvage of Cargo Vessel M/V Olivia
» Cargo Transfer from M/V Kocatepe S
» Installation of Western Black Sea Natural Gas & Oil Exploration & Production Platforms of TPAO
» Wreck Removal of Tugboat M/V Tajfun
» Salvage of Yacht Desire-4
» Salvage of General Cargo Vessel M/V Mina-I
» Geotechnical Site Investigations of Akçakoca Natural Gas Exploration & Production Projects of TPAO
» Wreck Removal of General Cargo Ship M/V Mare
» Jetty Reinforcement in Port of Arzew (Algeria)
» Abutaraba Desalination Plant Seawater Intake Line Construction (Libya)
» Refloatation of Seismic Survey Vessel M/V Pejwak (Azerbaijan)
» Limbo and Reverse-Limbo of Cargo of M/V Ariadne
» Arzew Desalination Plant & Power Station Brine Outfall Construction (Algeria)
» Removal of Fuel Oil & Lubricating Oil from Cargo Vessel M/V Corona Z
» Cleaning of Oil Pollution Caused by Cargo Vessel M/V MSC Roberta
» Bou-Haroun Port Dredging Works (Algeria)
» Recovery of Fuel Oil & Lubricating Oil from M/T Yakıt-1 Tanker
» Salvage of Cargo Vessel M/V Lujin-1
» Salvage of Seabus Delphine XXII
» Refloatation of Büyük Çamlıca
» Salvage of Cargo Vessel M/V Mustafa Sofuoğlu
» Salvage of Bulk Carrier M/V Pos Ambition
» Cleaning of Oil Pollution Caused by Antarctica & Sfakia Tankers
» Salvage of Cargo Barge F/B Rosetti Uno
» Wreck Removal of General Dry Cargo Ship M/V Robel
» Ege Gas LNG Terminal Sea Water Intake & Discharge Pipelines Construction
» Salvage of Cargo Vessel M/V Nazım Bayraktar
» Transfer of Fuel Oil from M/V Pelmariner & Cleaning of Environmental Pollution
» Prevention & Cleaning of Environmental Pollution Resulted from M/V Martin P
» Refloatation of M/T Marmara Tanker
» Environmental Cleaning of Serious Oil Pollution Caused by TPAO Tanker
» Salvage of M/T Metin KA from Enourmous Explosion on TPAO Tanker
  Towage of 500 m in Length One Piece Pipes of Enka Construction to Libya


Name of Project

Towage of Pipes of ENKA

Place of Project

İstanbul / TÜRKİYE – Derna / LİBYA

Working Dates

May 20, 2008May 26, 2008

Organizations Involved

§      ENKA Teknik General Contracting Maintenance Operation and Management Inc. (Employer)

§      FIRAT Plastic Rubber Industry and Trade Co.

§      TRANSBOSPHOR Maritime Transport Industry & Trade Ltd. (Agency)

§      T.R. Ministry of Transport, Directorate General of Coastal Safety, Department of Turkish Straits Vessel Traffic Services, Centre of Çanakkale Strait Vessel Traffic Services

Scope of Works

6 PE 100 pipes (each one having 500 m length, 1.4 m diameter, 55 mm wall thickness, and 110 tons weight) produced as one piece by FIRAT Plastic in Türkiye in order to be used for intake of seawater and distribution of drinking water at desalination plant which is being constructed by ENKA Construction in Libya were towed from İstanbul to Libya by our tugboat Pehlivan-2.

For the first time in Türkiye, a towage at this extent was realized by ARAS. The convoy in length of 605 m and width of 10 m was tugged to Libya successfully and towage was accomplished safely. Çanakkale Strait was closed to maritime traffic and three tugboats escorted to Pehlivan-2 for safety during the passage.

  Data1 Yazılım & Web Tasarım