Main Page | Contact | Türkçe
 
» Qatar Gabbro Berth Expansion Projects at Mesaieed Port Berth-3
» Reinforcement of Breakwater Mustapha (Algeria)
» Wreck Removal of Ro-Ro Vessel Hayat N
» Salvage of Karaköy Passenger Terminal Barge
» Wreck Removal of Sunken Cargo Vessel M/V Dimitrios P
» Towage of Accommodation Barge Ersai 400
» Salvage of Tugboat M/T Aktak
» Reconstruction & Reinforcement of Breakwater Kheireddine (Algeria)
» Towage of 500 m in Length One Piece Pipes of Enka Construction to Libya
» Salvage of Cargo Vessel M/V Herex 4
» Salvage of Cargo Vessel M/V Olivia
» Cargo Transfer from M/V Kocatepe S
» Installation of Western Black Sea Natural Gas & Oil Exploration & Production Platforms of TPAO
» Wreck Removal of Tugboat M/V Tajfun
» Salvage of Yacht Desire-4
» Salvage of General Cargo Vessel M/V Mina-I
» Geotechnical Site Investigations of Akçakoca Natural Gas Exploration & Production Projects of TPAO
» Wreck Removal of General Cargo Ship M/V Mare
» Jetty Reinforcement in Port of Arzew (Algeria)
» Abutaraba Desalination Plant Seawater Intake Line Construction (Libya)
» Refloatation of Seismic Survey Vessel M/V Pejwak (Azerbaijan)
» Limbo and Reverse-Limbo of Cargo of M/V Ariadne
» Arzew Desalination Plant & Power Station Brine Outfall Construction (Algeria)
» Removal of Fuel Oil & Lubricating Oil from Cargo Vessel M/V Corona Z
» Cleaning of Oil Pollution Caused by Cargo Vessel M/V MSC Roberta
» Bou-Haroun Port Dredging Works (Algeria)
» Recovery of Fuel Oil & Lubricating Oil from M/T Yakıt-1 Tanker
» Salvage of Cargo Vessel M/V Lujin-1
» Salvage of Seabus Delphine XXII
» Refloatation of Büyük Çamlıca
» Salvage of Cargo Vessel M/V Mustafa Sofuoğlu
» Salvage of Bulk Carrier M/V Pos Ambition
» Cleaning of Oil Pollution Caused by Antarctica & Sfakia Tankers
» Salvage of Cargo Barge F/B Rosetti Uno
» Wreck Removal of General Dry Cargo Ship M/V Robel
» Ege Gas LNG Terminal Sea Water Intake & Discharge Pipelines Construction
» Salvage of Cargo Vessel M/V Nazım Bayraktar
» Transfer of Fuel Oil from M/V Pelmariner & Cleaning of Environmental Pollution
» Prevention & Cleaning of Environmental Pollution Resulted from M/V Martin P
» Refloatation of M/T Marmara Tanker
» Environmental Cleaning of Serious Oil Pollution Caused by TPAO Tanker
» Salvage of M/T Metin KA from Enourmous Explosion on TPAO Tanker
  Installation of Western Black Sea Natural Gas & Oil Exploration & Production Platforms of TPAO


Name of Project

TPAO Western Black Sea Platform Installation

Place of Project

Karadeniz Ereğli – Zonguldak / TÜRKİYE

Working Dates

May 2005 – October 2007

Organizations Involved

§ .TPAO Turkish Petroleum Corporation

§ .Madison Oil Turkey Inc. (Partner of TPAO)

§ .Toreador Turkey Ltd. (Partner of TPAO)

§ .Momentum Engineering (Contractor)

§ .Valentine Maritime (Gulf) LLC (UAE) (Pipe Laying Subcontractor)

§ .Fugro Oceansismica SPA (Firm Responsible for Seismic Works)

§ .T.R. General Directorate of Petroleum Affairs

§ .Micoperi Marine Contractors (Crane Subcontractor)

§ .Mert Inc.

§ .T.R. Ministry of Transport, Directorate General of Coastal Safety & Salvage Administration

§ .İstanbul Marine & Survey Services Ltd.

§ .T.R. Prime Ministry Undersecretariat of Maritime Affairs, Karadeniz Ereğli Harbour Master’s Office

§ .T.R. Prime Ministry Undersecretariat of Maritime Affairs, Akçakoca Harbour Master’s Office

§ .Karadeniz Ereğli Denizcilik Dış Ticaret ve Nakliye Ltd.

§ .Global Denizcilik San. ve Tic. Ltd.

§ .T.R. Prime Ministry Undersecretariat of Maritime Affairs, Derince Harbour Master’s Office

§ .General Directorate of Turkish State Railways, Haydarpaşa Port Administration Directorate

Scope of Works

Aras rendered services involving seismic exploration, geotechnical site investigations, installation of platforms, and drilling activities in the location works of the wells to be drilled within the natural gas and oil exploration and production works off Akçakoca in the Western Black Sea being pursued collectively by TPAO, Madison Oil Turkey Inc., and Toreador Turkey Ltd.

§ .Aras rendered services of towage of three natural gas and oil production platforms having three legs from İzmit-Derince to the sites of Ayazlı, Eastern Ayazlı, and Akkaya determined by TPAO in Karadeniz Ereğli, 10 kilometers away from Düzce-Akçakoca and laying of underwater pipe system for connecting the platforms to each other and the facilities on shore.

§ .These services were realized by Pehlivan-2 as seismic exploration vessel for all seismic exploration works in the area, floating crane Herkül, tugs of Pegasus-3, Reis-6, and Vega 3, flat, twin barges Seka Ak-1 and Seka Ak-2 and by the vessels (floating cranes of Barbaros III and Levent, tugs of Yaşardoğu 1, Kocabaş, Söndüren 3, 4, 5, and 6, Kurtarma 1 and 2, G. Kurtaran, Alemdar) hired from Directorate General of Coastal Safety & Salvage Administration beside other necessary equipment.

  Data1 Yazılım & Web Tasarım