» Qatar Gabbro Berth Expansion Projects at Mesaieed Port Berth-3
» Reinforcement of Breakwater Mustapha (Algeria)
» Wreck Removal of Ro-Ro Vessel Hayat N
» Salvage of Karaköy Passenger Terminal Barge
» Wreck Removal of Sunken Cargo Vessel M/V Dimitrios P
» Towage of Accommodation Barge Ersai 400
» Salvage of Tugboat M/T Aktak
» Reconstruction & Reinforcement of Breakwater Kheireddine (Algeria)
» Towage of 500 m in Length One Piece Pipes of Enka Construction to Libya
» Salvage of Cargo Vessel M/V Herex 4
» Salvage of Cargo Vessel M/V Olivia
» Cargo Transfer from M/V Kocatepe S
» Installation of Western Black Sea Natural Gas & Oil Exploration & Production Platforms of TPAO
» Wreck Removal of Tugboat M/V Tajfun
» Salvage of Yacht Desire-4
» Salvage of General Cargo Vessel M/V Mina-I
» Geotechnical Site Investigations of Akçakoca Natural Gas Exploration & Production Projects of TPAO
» Wreck Removal of General Cargo Ship M/V Mare
» Jetty Reinforcement in Port of Arzew (Algeria)
» Abutaraba Desalination Plant Seawater Intake Line Construction (Libya)
» Refloatation of Seismic Survey Vessel M/V Pejwak (Azerbaijan)
» Limbo and Reverse-Limbo of Cargo of M/V Ariadne
» Arzew Desalination Plant & Power Station Brine Outfall Construction (Algeria)
» Removal of Fuel Oil & Lubricating Oil from Cargo Vessel M/V Corona Z
» Cleaning of Oil Pollution Caused by Cargo Vessel M/V MSC Roberta
» Bou-Haroun Port Dredging Works (Algeria)
» Recovery of Fuel Oil & Lubricating Oil from M/T Yakıt-1 Tanker
» Salvage of Cargo Vessel M/V Lujin-1
» Salvage of Seabus Delphine XXII
» Refloatation of Büyük Çamlıca
» Salvage of Cargo Vessel M/V Mustafa Sofuoğlu
» Salvage of Bulk Carrier M/V Pos Ambition
» Cleaning of Oil Pollution Caused by Antarctica & Sfakia Tankers
» Salvage of Cargo Barge F/B Rosetti Uno
» Wreck Removal of General Dry Cargo Ship M/V Robel
» Ege Gas LNG Terminal Sea Water Intake & Discharge Pipelines Construction
» Salvage of Cargo Vessel M/V Nazım Bayraktar
» Transfer of Fuel Oil from M/V Pelmariner & Cleaning of Environmental Pollution
» Prevention & Cleaning of Environmental Pollution Resulted from M/V Martin P
» Refloatation of M/T Marmara Tanker
» Environmental Cleaning of Serious Oil Pollution Caused by TPAO Tanker
» Salvage of M/T Metin KA from Enourmous Explosion on TPAO Tanker
  Salvage of Yacht Desire-4


Name of Vessel

Desire-4

Date of Incident

September 1, 2007

Place of Incident

Bozcaada – Çanakkale / TÜRKİYE

Gerçekleşen Olay

Fiber yacht Desire-4 in length of 17 m ran aground near Bozcaada and generated a risk of marine and environmental pollution due to the fuel oil loaded on her tank. Lloyd’s Salvage Agreement, LOF 2000 on the “No Cure, No Pay” basis was signed and operations began.

Çalışma Tarihleri

September 3, 2007September 13, 2007

İlgili Organizasyonlar

§      Aksigorta (Insurer of Yacht)

§      T.R. Prime Ministry Undersecretariat of Maritime Affairs, Directorate of Çanakkale Region, Bozcaada Harbour Master’s Office

§      T.R. Ministry of Transport, Directorate General of Coastal Safety

§      T.R. Municipality of Bozcaada

§      Ataköy Marina Yacht Harbour

Çalışmaların Kapsamı

Following operations were carried out under the supervision of P&I Club:

§     .Primarily, the fuel oil generating a risk of marine pollution was removed.

§     .The yacht was lifted by the aid of our floating crane Herkül and set on Herkül. Then, temporary repair was realized.

§     .Afterwards, Desire-4 was towed by Reis-6 to Ataköy Marina in İstanbul and consigned to her owner.