» Qatar Gabbro Berth Expansion Projects at Mesaieed Port Berth-3
» Reinforcement of Breakwater Mustapha (Algeria)
» Wreck Removal of Ro-Ro Vessel Hayat N
» Salvage of Karaköy Passenger Terminal Barge
» Wreck Removal of Sunken Cargo Vessel M/V Dimitrios P
» Towage of Accommodation Barge Ersai 400
» Salvage of Tugboat M/T Aktak
» Reconstruction & Reinforcement of Breakwater Kheireddine (Algeria)
» Towage of 500 m in Length One Piece Pipes of Enka Construction to Libya
» Salvage of Cargo Vessel M/V Herex 4
» Salvage of Cargo Vessel M/V Olivia
» Cargo Transfer from M/V Kocatepe S
» Installation of Western Black Sea Natural Gas & Oil Exploration & Production Platforms of TPAO
» Wreck Removal of Tugboat M/V Tajfun
» Salvage of Yacht Desire-4
» Salvage of General Cargo Vessel M/V Mina-I
» Geotechnical Site Investigations of Akçakoca Natural Gas Exploration & Production Projects of TPAO
» Wreck Removal of General Cargo Ship M/V Mare
» Jetty Reinforcement in Port of Arzew (Algeria)
» Abutaraba Desalination Plant Seawater Intake Line Construction (Libya)
» Refloatation of Seismic Survey Vessel M/V Pejwak (Azerbaijan)
» Limbo and Reverse-Limbo of Cargo of M/V Ariadne
» Arzew Desalination Plant & Power Station Brine Outfall Construction (Algeria)
» Removal of Fuel Oil & Lubricating Oil from Cargo Vessel M/V Corona Z
» Cleaning of Oil Pollution Caused by Cargo Vessel M/V MSC Roberta
» Bou-Haroun Port Dredging Works (Algeria)
» Recovery of Fuel Oil & Lubricating Oil from M/T Yakıt-1 Tanker
» Salvage of Cargo Vessel M/V Lujin-1
» Salvage of Seabus Delphine XXII
» Refloatation of Büyük Çamlıca
» Salvage of Cargo Vessel M/V Mustafa Sofuoğlu
» Salvage of Bulk Carrier M/V Pos Ambition
» Cleaning of Oil Pollution Caused by Antarctica & Sfakia Tankers
» Salvage of Cargo Barge F/B Rosetti Uno
» Wreck Removal of General Dry Cargo Ship M/V Robel
» Ege Gas LNG Terminal Sea Water Intake & Discharge Pipelines Construction
» Salvage of Cargo Vessel M/V Nazım Bayraktar
» Transfer of Fuel Oil from M/V Pelmariner & Cleaning of Environmental Pollution
» Prevention & Cleaning of Environmental Pollution Resulted from M/V Martin P
» Refloatation of M/T Marmara Tanker
» Environmental Cleaning of Serious Oil Pollution Caused by TPAO Tanker
» Salvage of M/T Metin KA from Enourmous Explosion on TPAO Tanker
  Geotechnical Site Investigations of Akçakoca Natural Gas Exploration & Production Projects of TPAO


Name of Project

TPAO Akçakoca Geotechnical Site Investigations

Place of Project

Akçakoca – Düzce / TÜRKİYE (Western Black Sea)

Working Dates

August 7, 2007 – August 28, 2007

Organizations Involved

§ TPAO Turkish Petroleum Corporation (Employer)

§ GEOS Geoteknik ve Sondajcılık Ltd.

§ ENAR Mühendislik, Mimarlık ve Danışmanlık Ltd.

§ AY-ER Harita, İnşaat, Bilgisayar, Turizm, İth., İhr., San. ve Tic. Ltd.

§ İstanbul Denizcilik ve Sörvey Hizmetleri

§ ITU Istanbul Technical University, Faculty of Civil Engineering, Soil Mechanics Laboratory

Scope of Works

This project was carried out with the cooperation of GEOS and ENAR and the following operations were carried out:

§ .Geotechnical site investigations were done until the depth of 120 m below seabed at predetermined locations in order to obtain geotechnical data and laboratory analyses of the soil samples were carried out.

§ .Geotechnical investigation was performed for gathering required data for the design of Akçakoca Offshore Platform to be constructed at 95 m depth.

§ .Soil samples were taken at every 3 m interval by drilling pipes and sent to the Soil Mechanics Laboratory of ITU Faculty of Civil Engineering to be analyzed.

§ .The drilling operations were finished on 14th of August.

§ .Drilling operations were conducted on our flat barge Seka Ak-2 having 5 mooring anchors. Tugboats Reis-6 and Vega 3 were also used in the operations.

§ .Seka Ak-2 was located 14 km away from the shore, accurately and bathymetric map of the site was prepared.

§ .Shell and auger boring and rotary boring methods were applied.

§ .After completing the site investigations and laboratory analyses, a detailed Geotechnical Report including following items was presented on 28th of August:

®       General geological structure of the area & that of the investigation site

®       Soil condition of the site

®       Lithological-Geotechnical properties of soil layers

®       Soil parameters

®       Pile diameter and length

®       Seismicity of the site