Main Page | Contact | Türkçe
 
» Qatar Gabbro Berth Expansion Projects at Mesaieed Port Berth-3
» Reinforcement of Breakwater Mustapha (Algeria)
» Wreck Removal of Ro-Ro Vessel Hayat N
» Salvage of Karaköy Passenger Terminal Barge
» Wreck Removal of Sunken Cargo Vessel M/V Dimitrios P
» Towage of Accommodation Barge Ersai 400
» Salvage of Tugboat M/T Aktak
» Reconstruction & Reinforcement of Breakwater Kheireddine (Algeria)
» Towage of 500 m in Length One Piece Pipes of Enka Construction to Libya
» Salvage of Cargo Vessel M/V Herex 4
» Salvage of Cargo Vessel M/V Olivia
» Cargo Transfer from M/V Kocatepe S
» Installation of Western Black Sea Natural Gas & Oil Exploration & Production Platforms of TPAO
» Wreck Removal of Tugboat M/V Tajfun
» Salvage of Yacht Desire-4
» Salvage of General Cargo Vessel M/V Mina-I
» Geotechnical Site Investigations of Akçakoca Natural Gas Exploration & Production Projects of TPAO
» Wreck Removal of General Cargo Ship M/V Mare
» Jetty Reinforcement in Port of Arzew (Algeria)
» Abutaraba Desalination Plant Seawater Intake Line Construction (Libya)
» Refloatation of Seismic Survey Vessel M/V Pejwak (Azerbaijan)
» Limbo and Reverse-Limbo of Cargo of M/V Ariadne
» Arzew Desalination Plant & Power Station Brine Outfall Construction (Algeria)
» Removal of Fuel Oil & Lubricating Oil from Cargo Vessel M/V Corona Z
» Cleaning of Oil Pollution Caused by Cargo Vessel M/V MSC Roberta
» Bou-Haroun Port Dredging Works (Algeria)
» Recovery of Fuel Oil & Lubricating Oil from M/T Yakıt-1 Tanker
» Salvage of Cargo Vessel M/V Lujin-1
» Salvage of Seabus Delphine XXII
» Refloatation of Büyük Çamlıca
» Salvage of Cargo Vessel M/V Mustafa Sofuoğlu
» Salvage of Bulk Carrier M/V Pos Ambition
» Cleaning of Oil Pollution Caused by Antarctica & Sfakia Tankers
» Salvage of Cargo Barge F/B Rosetti Uno
» Wreck Removal of General Dry Cargo Ship M/V Robel
» Ege Gas LNG Terminal Sea Water Intake & Discharge Pipelines Construction
» Salvage of Cargo Vessel M/V Nazım Bayraktar
» Transfer of Fuel Oil from M/V Pelmariner & Cleaning of Environmental Pollution
» Prevention & Cleaning of Environmental Pollution Resulted from M/V Martin P
» Refloatation of M/T Marmara Tanker
» Environmental Cleaning of Serious Oil Pollution Caused by TPAO Tanker
» Salvage of M/T Metin KA from Enourmous Explosion on TPAO Tanker
  Salvage of Cargo Vessel M/V Nazım Bayraktar


Name of Vessel

M/V Nazım Bayraktar

Date of Incident

January 30, 2001

Place of Incident

Haydarpaşa – İstanbul / TÜRKİYE

Incident

Turkish flagged, 1175 DWT cargo vessel Nazım Bayraktar sank at a depth of 13 m as a result of stability problem during loading of 1100 tons of wheat in Haydarpaşa Port. Fuel, oil, and other materials on board caused marine pollution.

Working Dates

February 22, 2001March 19, 2001

Organizations Involved

§      Southern Seas Ltd. (UK) (P&I Club)

§      Kapadokya Danışmanlık ve Sigorta Aracılık Hizmetleri (Representative of P&I Club)

§      Bayraktar Gemicilik ve Pazarlama San. Tic. AŞ (Shipowner)

§      Marine Consultants Ltd. (UK)

Scope of Works

Wreck Removal Agreement, “Wreckfixed 99”, on the basis of “No Cure, No Pay” was signed with P&I Club after the underwater survey carried out by our divers and following operations were carried out:

§      Discharge of the cargo, fuel, and oil

§      Removal of wheat spread on seabed

§      Refloatation of the ship

  Data1 Yazılım & Web Tasarım