Main Page | Contact | Türkçe
 
» Qatar Gabbro Berth Expansion Projects at Mesaieed Port Berth-3
» Reinforcement of Breakwater Mustapha (Algeria)
» Wreck Removal of Ro-Ro Vessel Hayat N
» Salvage of Karaköy Passenger Terminal Barge
» Wreck Removal of Sunken Cargo Vessel M/V Dimitrios P
» Towage of Accommodation Barge Ersai 400
» Salvage of Tugboat M/T Aktak
» Reconstruction & Reinforcement of Breakwater Kheireddine (Algeria)
» Towage of 500 m in Length One Piece Pipes of Enka Construction to Libya
» Salvage of Cargo Vessel M/V Herex 4
» Salvage of Cargo Vessel M/V Olivia
» Cargo Transfer from M/V Kocatepe S
» Installation of Western Black Sea Natural Gas & Oil Exploration & Production Platforms of TPAO
» Wreck Removal of Tugboat M/V Tajfun
» Salvage of Yacht Desire-4
» Salvage of General Cargo Vessel M/V Mina-I
» Geotechnical Site Investigations of Akçakoca Natural Gas Exploration & Production Projects of TPAO
» Wreck Removal of General Cargo Ship M/V Mare
» Jetty Reinforcement in Port of Arzew (Algeria)
» Abutaraba Desalination Plant Seawater Intake Line Construction (Libya)
» Refloatation of Seismic Survey Vessel M/V Pejwak (Azerbaijan)
» Limbo and Reverse-Limbo of Cargo of M/V Ariadne
» Arzew Desalination Plant & Power Station Brine Outfall Construction (Algeria)
» Removal of Fuel Oil & Lubricating Oil from Cargo Vessel M/V Corona Z
» Cleaning of Oil Pollution Caused by Cargo Vessel M/V MSC Roberta
» Bou-Haroun Port Dredging Works (Algeria)
» Recovery of Fuel Oil & Lubricating Oil from M/T Yakıt-1 Tanker
» Salvage of Cargo Vessel M/V Lujin-1
» Salvage of Seabus Delphine XXII
» Refloatation of Büyük Çamlıca
» Salvage of Cargo Vessel M/V Mustafa Sofuoğlu
» Salvage of Bulk Carrier M/V Pos Ambition
» Cleaning of Oil Pollution Caused by Antarctica & Sfakia Tankers
» Salvage of Cargo Barge F/B Rosetti Uno
» Wreck Removal of General Dry Cargo Ship M/V Robel
» Ege Gas LNG Terminal Sea Water Intake & Discharge Pipelines Construction
» Salvage of Cargo Vessel M/V Nazım Bayraktar
» Transfer of Fuel Oil from M/V Pelmariner & Cleaning of Environmental Pollution
» Prevention & Cleaning of Environmental Pollution Resulted from M/V Martin P
» Refloatation of M/T Marmara Tanker
» Environmental Cleaning of Serious Oil Pollution Caused by TPAO Tanker
» Salvage of M/T Metin KA from Enourmous Explosion on TPAO Tanker
  Environmental Cleaning of Serious Oil Pollution Caused by TPAO Tanker


Name of Vessel

M/T TPAO

Date of Incident

February 13, 1997

Place of Incident

Tuzla – İstanbul / TÜRKİYE

Incident

Following an enormous explosion, a big fire started on 163,308 DWT TPAO tanker during maintenance in Tuzla Port. After the fire, crude oil and oil spread over Tuzla Aydınlık Bay and caused severe environmental marine pollution. Our company was awarded the contract concerning environmental cleaning operations by DİTAŞ.

Working Dates

March 13, 1997May 21, 1997

Organizations Involved

§      T.R. Governorship of İstanbul, Committee of TPAO Tanker Fire Monitoring, Assessment, and Coordination

§      T.R. İstanbul Metropolitan Municipality, Department of Environment Protection and Development

§      ITOPF International Tanker Owners Pollution Federation

§      DİTAŞ Marine Operations and Tanker Management Co.

§      CEDRE Centre of Documentation, Research & Experimentation on Accidental Water Pollution

§      T.R. Ministry of Environment and Forestry, İstanbul Directorate of Environment and Forestry

§      GİSBİR Turkish Shipbuilders Association

§      GİSAŞ Gemi İnşa Sanayi AŞ

§      Omur Marine Ltd.

§      T.R. İstanbul University, Institute of Marine Sciences and Management

§      T.R. Tuzla Kaimakam’s Office

§      T.R. Municipality of Tuzla

§      İZAYDAŞ İzmit Waste and Residue Treatment, Incineration, and Recycleing Co Inc.

Scope of Works

On the accident day, our company immediately went to the accident place and joined the fire extinguishing operations. The ropes connecting the chemical substance tanker Metin KA to the burning TPAO tanker were cut while the fire was persisting and then, Metin KA was towed to a safe place. After the cleaning works was given to our company, the operations started in line with the findings of ITOPF and the committee and following operations carried out under the supervision of them:

§     .In the first place, crude oil floating over the sea surface was surrounded by oil barriers, restricted, and then, collected by particular pumps and oil absorbents.

§     .The severe environmental pollution occurred on the shores and in the shipyards on the bay due to the fire was cleaned entirely by hot water jets and also, manually.

§     .Approximately, 593 tons of wastes and pollutants spread over the bay were collected and sent to İZAYDAŞ for disposal.